Funding adjustment for prior learning: Field
Definition
The proportion of this learning aim still to be delivered.
Reason Required
To allow correct calculation of funding for learners who are not entitled to full funding for the learning aim.
Schema Definitions
- XML Entity Name
- PriorLearnFundAdj
- Field Length
- 2
- Data type
- xs:int
- Minimum occurrences
- 0
- Maximum occurrences
- 1
- Part of
- LearningDelivery
Collection Requirements
- Aim Type 1 and 3
-
- Apprenticeships (FundModel 36)
- Other Adult (FundModel 81)
- Adult Skills Traineeships (FundModel 35 and ProgType 24)
- Skills Bootcamps (FundModel 37, Prog Type 32)
- Aim Type 4
-
- Advanced Learner Loans
- Aim Type 3 and 4
-
- Adult Skills (FundModel 35)
- Other Adult (FundModel 81)
Valid Entries
Must contain a value in the range 0 to 99
Notes
-
This field may be required for some learning aims that are funded by Other Adult funding.
-
This field should be completed with the proportion of this learning aim that is still to be delivered where the learner is not undertaking the full scope of the learning aim because of prior learning.
-
If you are delivering all of the learning for this aim and no adjustment to funding is required, this field must not be returned.
-
Refer to the Provider Support Manual for further guidance about prior learning, restarts and transfers.
Traineeships
-
For learners who start a traineeship programme from 1 August 2015, if a funding adjustment is required to the single traineeships programme rate, then this field should be completed on the programme aim (Aim type = 1).
-
If a funding adjustment is required to the English, maths or flexible element aims, then this field should be completed on the relevant component aims (Aim type = 3).
Apprenticeship standards
-
This field should be recorded where applicable